Discover three miles of connected multi-use trails in Jackson, Mississippi
Trail Phases
Museum Trail is almost 50% completed — a total of 2.8 miles of 6 miles of planned multi-use trail. The trail is divided into 8 phases.
Phase 01 “Belhaven Connector” was completed and opened in Spring 2021. This 1.7 miles section was built on the original GM&O Railline. The rail to trail project is located in the Greater Belhaven Neighborhood.
Phase 02 “Waterworks Connector” opened in Fall 2023. This .3 mile connector runs in between the highway and former water plant infrastructure. The project connects Greater Belhaven with LeFleur’s Museum District.
Phase 03 “LeFleur’s Bluff Park Connector” was completed in Spring 2024. The .7 mile trail meanders through the new LeFleur’s Bluff Park.
Future Phases are being planned to connect over Lakeland Drive to LeFleur East Neighborhood and South through Downtown Jackson along Commerce Street and Court Street, through the Arts District, and extending to Jackson State University Campus.
-
Laurel Street Access Point
Trail Entrance in Belhaven
-
Waterworks Access Point
From Belhaven to Lefleur’s Bluff
-
Spotter's Adventure Trail
Interactive Trail at LeFleur's Bluff
-
Belhaven Mtn Bike Trail
Off-Road Marked Bicycle Trail
-
Riverside Drive Connector
From Belhaven to Museum Blvd
-
Belhaven Beach Trail
Neighborhood Beach Access